Terminal 2 of Mumbai’s international airport is one of India’s most iconic aviation infrastructures, designed to handle millions of passengers from all nationalities with seamless efficiency and world-class amenities. The project demanded engineering precision, strict safety compliance, and coordinated execution across multiple zones—all in a high-security environment.
Inner Space was entrusted with multiple interior infrastructure packages across different phases of the terminal’s development and operations. The scope included- raised access flooring, large-scale metal ceiling installations, and modular toilet cubicle systems—each executed to meet the stringent quality and performance standards of airport infrastructure.

Scope of Work

01. Raised Access Flooring – Security & Technical Zones (Year 2010)

Bare Tile Flooring: 50,000 sqft

Laminate Finish Flooring: Approx. 8,000 sqft

02. Metal False Ceiling – Parking Level Lobbies (2010)

The parking lobby ceilings required large-scale, durable, and visually consistent metal ceiling systems.

  • Precision installation ensured uniform alignment across massive ceiling spans.
  • Systems were designed to integrate lighting, ventilation, and service elements seamlessly.
  • The result was a clean, structured ceiling solution suited for high-traffic public infrastructure.
03. Stainless Steel Toilet Cubicles – Parking Levels (2025)
These cubicles were installed to meet the durability, hygiene, and maintenance requirements of busy airport parking facilities.
  • Stainless-steel construction ensured corrosion resistance, strength, and easy cleaning.
  • LED indicator locks improved user convenience and occupancy visibility.
  • The modular systems meant clean, fast and precise installation in and active operational zones.

Execution Highlights

  • Total Project Duration: Approx. 1 year (executed in phases as per site clearances)
  • Execution Partners:
    • L&T
    • Ashish Interbuild
    • Patenkar Kale Construction
    • Hunter Douglas

Key execution factors included:

    • Systematic, phase-wise planning aligned with airport operations.
    • Strict adherence to safety and security protocols at all times.
    • Thorough material testing and approvals by L&T before installation.
    • Complete CAD drawings and technical detailing provided by Inner Space.

Key Project Features

  • Large-scale raised access flooring across security and technical zones
  • 80,000 sqft precision-installed aluminium metal ceilings
  • Full stainless-steel toilet cubicles with LED indicator systems
  • Close coordination with major infrastructure contractors and consultants

Outcome

The Terminal 2 project demonstrates Inner Space’s capability to execute complex, large-scale interior infrastructure works within high-security, high-footfall environments. The successful delivery across flooring, ceiling, and restroom systems reflects disciplined execution, technical expertise, and dependable project management. Today, Inner Space’s work spans all three major Mumbai airports—Sahar Domestic Terminal, Chatrapati Shivaji Maharaj T2 International Terminal, and the upcoming NMIAL—reflecting long-standing trust and continued collaboration across the city’s developing infrastructure.